10. February 2014

Professional renovation of existing hall properties through PEM-Upgrade

PEM successfully brings existing buildings up-to-date both technologically and energetically. The technical planning, renovation, modernisation and energetic optimisation of the production halls for Mainfränkische Werkstätten GmbH in Würzburg also bear the signature of PEM.

The shed roof cladding and the glazing, the blind system and all wall claddings were removed and disposed of. This was followed by the raising of the existing framework constructions with Mero nodes to form a flat roof made of approx. 80 tonnes of steel, the covering with a trapezoidal sheet load bearing layer and the wall cladding with 800m2 sandwich facade.