10. February 2021
ACV Donausegel, Vienna, Austria
Execution period: Feb. – Dec. 2019
Location: Bruno-Kreisky-Platz 1, 1220 Vienna, Austria
Client: Austria Center Vienna, IAKW – AG
Design: Dietrich/Untertrifaller Architekten ZT GmbH
Executed work: Zeman & Co GmbH executed the work as general contractor. Detail statics, workshop planning, production, delivery and installation of steel construction, metal facade.
Technical specifications: Steel construction: 900 t, dimensions: approx. 90×65 m, heigth from top edge foundation to lower edge roof: 25,8 m, roof height: 0,8 to 4,5 m, reinforcing steel: 105 t, top roof cladding: 6.000 m²/42 t (trapezoidal sheet and foil roof), roof covering perforated at the bottom: 4.350 m²/34 t (trapezoidal sheet metal), Alucobond® cladding: 3.800 m², wall casing made of PU panels: 4.000 m², double floor panels wood: 4.200 m²/134 t, double floor wood and steel: 16.500 m/120 t, installation rails: 2.200 linear m/18 t, fire protection panels: 1.000 m², DSV-concrete body: 1.650 m³, fiber optic cable: 600 m, wiring: 24.000 m, rainwater pipes: 900 m.
Execution class: EXC 3
Order value: EUR 12.000.000.- excl. VAT