10. February 2021

ACV Donausegel, Vienna

Project period: February – December 2019
Location: Bruno-Kreisky-Platz 1, 1220 Vienna
Client: Austria Center Vienna, IAKW-AG
Planning: Dietrich/Untertrifaller Architekten ZT GmbH
Work carried out: Zeman & Co GmbH carried out the work as general contractor. Detailed structural analysis, workshop planning, production,
Delivery and assembly of steel structure, metal façade.
Technical data: Steel construction: 900 tons, dimensions: approx. 90×65 m, lower edge of roof from top edge of foundation: 25.8 m, roof height: from 0.8 to 4.5 m, reinforcing steel: 105 t, roof cladding above: 6,000 m² or 42 t (trapezoidal sheet metal and foil roof), roof cladding perforated below: 4.350 m² or 34 t (trapezoidal sheet metal), Alucobond® cladding: 3,800 m², wall cladding PU panels: 4,000 m², raised floor panels wood: 4,200 m² or 134 t, raised floor wood and steel: 16,500 running meters or 120 t, installation rails: 2,200 running meters or 18 t., Fire protection panels: 1,000 m², DSV concrete body: 1,650 m³, fiber optic cable: 600 m, cabling: 24,000 m,
Rainwater pipes: 900 m.
Execution class: EXC 3
Contract value: EUR 12,000,000 excl. VAT.