Brückner Tittmoning
![](https://zeman-group.com/wp-content/uploads/2023/05/Brueckner_1_©PEM-Buildings-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2023/05/Brueckner_2_©PEM-Buildings-scaled-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2023/05/Brueckner_3_©PEM-Buildings-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2023/05/Brueckner_4_©PEM-Buildings-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2023/05/Brueckner_5_©PEM-Buildings-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2023/05/Brueckner_6_©PEM-Buildings-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2023/05/Brueckner_7_©PEM-Buildings-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2023/05/Brueckner_8_©PEM-Buildings-scaled-354x266-c-default.jpg)
- Company:
- PEM GmbH
- Client:
- Brückner Grundbesitzverwaltung Tittmoning GmbH & Co. KG
- Investor, Builder:
- Brückner Grundbesitzverwaltung Tittmoning GmbH & Co. KG
- Designer:
- PEM GmbH
- Country, City:
- Germany, Tittmoning
- Object category:
- architecture building, general contractor, Hall, warehouse, logistics, commercial and production
- Material:
- Roof, facade, steel
- Services:
- Assembly, Engineering, Supply
- Completion:
- 2018
Production plant for Brückner Textile and an adjoining office building. A steel framework construction on reinforced concrete columns was erected on an area of 25,900 m² and an office building with 1,700 m². A photovoltaic system was also installed on the flat roof and a 28,500 m² green belt with ... trees and bushes was created around the company building.