Pedestrian bridge Fa. Spitz
![](https://zeman-group.com/wp-content/uploads/2022/02/IMG_2728b-scaled-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2022/02/IMG_5061-scaled-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2022/02/IMG_5068-scaled-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2022/02/IMG_6041-scaled-354x266-c-default.jpg)
- Company:
- Zeman & Co GmbH
- Client:
- EW- Bau GmbH
- Investor, Builder:
- Spitz GmbH Attnang-Puchheim
- Designer:
- Architekturplanung: Dr. Shebl & Partner Generalplaner GmbH
- Country, City:
- Attnang-Puchheim, Austria
- Object category:
- Bridges, Infrastructure
- Material:
- steel
- Services:
- Assembly, Engineering, Production, Supply
- Completion:
- 2016
Work carried out: Structural analysis, planning, fabrication and assembly of the entire truss bridge. A 750 ton mobile crane was used for the assembly.