Boiler platforms FHW Arsenal
![](https://zeman-group.com/wp-content/uploads/2021/07/kb-1-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2021/07/kb-2-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2021/07/kb-3-354x266-c-default.jpg)
- Company:
- Zekon Spólka z o. o., Zeman & Co GmbH
- Client:
- Zauner Anlagenbau GmbH
- Investor, Builder:
- Wien Energie
- Designer:
- Statik: Eisner ZT GmbH; Zeman & Co
- Country, City:
- Austria, Vienna
- Object category:
- Industrial plants, Infrastructure
- Material:
- steel
- Services:
- Assembly, Engineering, Production, Supply
- Completion:
- 2013
Work carried out: Erection of the boiler platform steel structure of the combined heat and power plant, including laying of the grating covering and the required guardrails.