Logistics bridge for BMW engine plant

- Company:
- Zekon, Zeman & Co
- Client:
- BMW Motoren GmbH
- Investor, Builder:
- BMW Motoren GmbH
- Designer:
- Dr. Shebl & Partner Generalplaner GmbH
- Country, City:
- Austria, Steyr
- Object category:
- Bridges, Halls
- Material:
- Roof, facade, steel
- Services:
- Assembly, Engineering, Fabrication, Supply
- Completion:
- 2003
Work carried out: Logistics bridge with two levels over the railroad tracks to connect the production halls. The bridge was lifted into place with an 800-ton crane in 6 shots while the railroad was in operation.