Logistics bridge for BMW engine plant

Company:
ZEKON, Zeman & Co
Client:
BMW Motoren GmbH
Investor, Builder:
BMW Motoren GmbH
Designer:
Dr. Shebl & Partner Generalplaner GmbH
Country, City:
Austria, Steyr
Object category:
Bridges, Halls
Services:
Engineering, Assembly, Fabrication, Supply
Completion:
2003

Project Description

Work carried out: Logistics bridge with two levels over the railroad tracks to connect the production halls. The bridge was lifted into place with an 800-ton crane in 6 shots while the railroad was in operation.