Partial Expansion of the Samstagern Service Center, Roof Working Platforms

Company:
Zekon, Zeman & Co
Client:
SOB Swiss Southeast Railway AG
Investor, Builder:
SOB Swiss Southeast Railway AG
Designer:
Architect: K.N.O.L.L. GmbH; Project Management and Structural Engineering: Zeman & Co GmbH and KLIK Bühnensysteme Ges.m.b.H
Country, City:
Switzerland, Saturdayers
Object category:
Infrastructure
Material:
steel
Services:
engineering, installation, production, Supply
Completion:
2025

Kurzbeschreibung

Work Performed: Steel structure designed, produced, delivered, and installed; guardrails, ladders, and grating installed; platform construction; flooring; and extendable modules.
Technical Specifications: Roof working platform system for two tracks with total lengths of 153 m and 74 m, respectively, including complete stair and access systems, central control technology, connection to the overhead line control system, and integration of access control systems. The system features ladder systems and a specially developed, electrically powered mechanism for moving individual platform modules, designed to maximize the lateral working space along the length of the vehicle.
Total scope: 98 modu