Boehler stainless steel ESU
![](https://zeman-group.com/wp-content/uploads/2021/07/sth-1-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2021/07/sth-2-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2021/07/sth-3-354x266-c-default.jpg)
![](https://zeman-group.com/wp-content/uploads/2021/07/sth-4-354x266-c-default.jpg)
- Company:
- Zekon Spólka z o. o., Zeman & Co GmbH
- Client:
- Boehler Edelstahl
- Investor, Builder:
- Boehler Edelstahl
- Designer:
- Depisch Ziviltechniker und BHM Ingenieure Engineering & Consulting
- Country, City:
- Austria, Kapfenberg
- Object category:
- Hall, warehouse, logistics, commercial and production, Industrial plants
- Material:
- Roof, facade, steel
- Services:
- Assembly, Engineering, Production, Supply
- Completion:
- 2009
Work carried out: Double-aisled hall and single-aisled hall including crane systems, ventilation and window strips. Construction of an excavator washing hall, canopy over the block storage area and extension of the two-aisled production hall, crane systems, ventilation and window strips.