• object types
    architecture structural alteration facades and roofs long-span buildings industrial steelwork infrastructure sports facilities Zeman Railway Solutions
  • services
    general contractor project management engineering manufacturing assembly partner services
  • references
  • others about us
    awards media reports
  • Zeman Group
    history innovation management companies and project locations sustainability organisational chart
  • downloads
    brochures certificates sin profiles
  • contact
    legal info privacy policy
  • news
  • English
    • German
Suchen
Generic filters
  • LinkedIn
  • Facebook
Deutsch
  • object types
  • services
  • references
  • others about us
  • Zeman Group
  • downloads
  • contact
  • news
+43 1 81414 – 0 info@zeco.at
  • Back
  • object types
  • architecture
  • structural alteration
  • facades and roofs
  • long-span buildings
  • industrial steelwork
  • infrastructure
  • sports facilities
  • Zeman Railway Solutions
  • Back
  • services
  • general contractor
  • project management
  • engineering
  • manufacturing
  • assembly
  • partner services
  • Back
  • others about us
  • awards
  • media reports
  • Back
  • Zeman Group
  • history
  • innovation
  • management
  • companies and project locations
  • sustainability
  • organisational chart
  • Back
  • downloads
  • brochures
  • certificates
  • sin profiles
  • Back
  • contact
  • legal info
  • privacy policy

24. September 2019

Topping-out ceremony at the Donausegel

Christmas is still a long way off, but there is already a conifer in Vienna. The well-attended topping-out ceremony took place at the ACV on September 24. The Danube sail has reached roof level.

Back (Pupils from HTL Mödling visit the Danube sails) weiter (Danube sail takes shape)
Kontakt: +43 1 81414-0 | info@zeco.at | Impressum | Datenschutz| Internal access